JOB REFERENCE L
1984
Contract Title |
: |
Tai Po Sewage Treatment Works - Stage II |
Contract No. |
: |
1062/EM/80 |
Client |
: |
Hawker Siddeley Water Engineering Ltd |
End User |
: |
Electrical & Mechanical Services Department, Hong Kong Government |
Major Equipment |
: |
Aeration Tanks, Primary Sedimentation Tanks, Air Blowers and Penstocks, HVAC System. |
Construction Period |
: |
Mar 84 to Dec 84 |
1985-1986
Contract Title |
: |
Tin Shui Wai Development - Stage I Village Flood Screw Pumping
Station |
Contract No. |
: |
NTDB/27/85 |
Client |
: |
Hutchison-Boag Engineering Ltd |
End User |
: |
Territories Development Department, Hong Kong Government |
Major Equipment |
: |
Screw Pumps ( 10 sets), Penstocks, Lifting Facilities. |
Construction Period |
: |
Dec 85 to Jun 86 |
1986
Contract Title |
: |
Sai Kung Sewage Treatment Plant |
Contract No. |
: |
1064/EM/85 |
Client |
: |
Hutchison-Boag Engineering Ltd |
End User |
: |
Electrical & Mechanical Services Dept Hong Kong Government |
Major Equipment |
: |
Inlet Pumping Station (KSB pumps), Primary and Secondary Sedimentation
Tanks, Aeration Tanks, Chlorination Plant, Penstocks, HVAC System, Chemical
Dosing System, Dewatering System, GMS Structure Steel Maintenance platform |
Construction Period |
: |
May 86 to Dec 86 |
1987
Contract Title |
: |
Wanchai East Screening Plant |
Contract No. |
: |
1089/EM/86 |
Client |
: |
Jebsen Engineering Ltd |
End User |
: |
Electrical & Mechanical Services Department |
Major Equipment |
: |
Inlet Pumping Station (KSB pumps), Fine Screens, Classifiers, Grit Trap, Penstocks. |
Construction Period |
: |
Jun 87 to Dec 87 |
1987-1993
Contract Title |
: |
Fire Services Installation |
Contract No. |
: |
|
Client |
: |
Housing Authority, HK Government |
End User |
: |
Housing Authority, HK Government |
Major Equipment |
: |
Installation and relocation of sprinkler |
Construction Period |
: |
1987 to 1993 |
1988
Contract Title |
: |
Shatin Sewage Treatment Works - Stage II Sludge Digestion Equipment |
Contract No. |
: |
ST/28/86 |
Client |
: |
Hawker Siddeley Water Engineering Ltd |
End User |
: |
Electrical & Mechanical Services Department ¡V HK Government |
Major Equipment |
: |
Digestion
Tanks, Heater, Air Compressors, Vessel and Associated Pipeworks, FRP Working
platform, GMS Structure Steel
Platform |
Construction Period |
: |
Mar 88 to Jul 88 |
Contract Title |
: |
Hong Kong Island South Pollution Abatement, Storm Water Pumping
Stations |
Contract No. |
: |
CV/88/23 |
Client |
: |
Hutchison-Boag Engineering Ltd |
End User |
: |
Civil Engineering Services Department, Hong Kong Government |
Major Equipment |
: |
Submersible Pumps ( 18 sets) and Associated Pipework, Lifting
Facilities. |
Construction Period |
: |
Jun 89 to Jan 90 |
1989-1990
Contract Title |
: |
Yuen Long Sewage Treatment Works - Stage II Sewage Inlet Pumping
Stations |
Contract No. |
: |
1078/EM/88 |
Client |
: |
Water Engineering Ltd (Formerly Hawker Siddeley) |
End User |
: |
Drainage Services Department, |
Major Equipment |
: |
Screw Pumps, Maintenance Platform, Detritor, Raked Screen, Penstocks. |
Construction Period |
: |
Dec 89 to Apr 90 |
1990
Contract Title |
: |
Tai O Pumping Station No. 3 & 4 |
Contract No. |
: |
1025/EM/89 |
Client |
: |
Hutchison-Boag Engineering Ltd |
End User |
: |
Drainage Services Department, |
Major Equipment |
: |
Screw Pumps, Detritor, Raked Screen, Penstocks, HVAC System. |
Construction Period |
: |
Jan 90 to Aug 90 |
1990-1991
Contract Title |
: |
Pak Kong Water Treatment Works - Stage II Water Transfer Facilities |
Contract No. |
: |
55/WSD/88 |
Client |
: |
Water Engineering Ltd |
End User |
: |
Water Supplies Department, Hong Kong Government |
Major Equipment |
: |
Inlet Pumping Station, Backwash Pumps, Sludge Pumps and Associated
Pipework, Air Blowers, Air Compressors & Vessel, Thickening Tanks, Filter
Tank, Clarifier Tank, Dewatering System, Surge Vessel Protection System,
Penstocks and HVAC System, GMS Structure Steel Platform |
Construction Period |
: |
Jan 90 to Jul 91 |
1990-1991
Contract Title |
: |
Pak Kong Water Treatment Works |
Contract No. |
: |
53/WSD/88 |
Client |
: |
Aoki Corporation |
End User |
: |
Water Supplies Department, Hong Kong Government |
Major Equipment |
: |
Mild Steel pipeworks up to DN1600 |
Construction Period |
: |
Jun 90 to Jan 91 |
1990-1991
Contract Title |
: |
Yuen Long Sewage Treatment Works - Stage II Water Primary Sedimentation & Aeration Equipment |
Contract No. |
: |
1096/EM/88 |
Client |
: |
Water Engineering Ltd |
End User |
: |
Drainage Services Department |
Major Equipment |
: |
Primary Sedimentation Tanks, Aeration Tanks, Air Blowers &
Associated Pipework, HVAC System. |
Construction Period |
: |
Dec 90 to Jun 91 |
Contract Title |
: |
Ha Tsuen Sewage Pumping Station |
Contract No. |
: |
1006/EM/89 |
Client |
: |
Hutchison-Boag Engineering Ltd |
End User |
: |
Drainage Services Department |
Major Equipment |
: |
Sewage Pumps(Torishima) & Associated Pipework, Raked Screens,
Conveyors, Screen Presses, Penstocks, HVAC System and GRP platform, Generator
Set. |
Construction Period |
: |
Apr 91 to Aug 92 |
1992
Contract Title |
: |
Tin Shui Wai Development - Stage II Infrastructure Package 5 Pumping Stations |
Contract No. |
: |
YL/15/90 |
Client |
: |
Hutchison-Boag Engineering Ltd |
End User |
: |
Territories Development Department |
Major Equipment |
: |
Sewage Pumps & Associated Pipework, Fine Screen, Penstocks, Screw
Pump, Electro-chlorinator, HVAC System and steel platform, Generator Set |
Construction Period |
: |
Jan 92 to Jun 92 |
1993
Contract Title |
: |
Kwun Tong Sewage Screening Plant II E & M Installation |
Contract No. |
: |
DE/91/14 |
Client |
: |
Simon-Hartley |
End User |
: |
Drainage Services Department |
Major Equipment |
: |
Screen Pumps, Fine Screens, Screen Presses, Slewing Derrick, Maintenance Platform |
Construction Period |
: |
Jan 93 to Jun 93 |
1993
Contract Title |
: |
Kwun Tong Intermediate Pumping Station |
Contract No. |
: |
DE/91/14 |
Client |
: |
Water Engineering Ltd |
End User |
: |
Drainage Services Department |
Major Equipment |
: |
Screw Pumps DN2800, Coarse Screens, Penstocks, Maintenance Platform |
Construction Period |
: |
Jul 93 to Oct 93 |
1993-1994
Contract Title |
: |
Muk Woo `C` Pumping Station |
Contract No. |
: |
30/WSD/91 |
Client |
: |
Mitsubishi Corporation Ltd |
End User |
: |
Water Supply Department |
Major Equipment |
: |
Pump sets ( 10 nos.) to 3.8M3/sec
2250 kw each, Associated MS pipeworks up to DN2000, Surge Vessel Protection
System, Ventilation System and Structure Steel Platform |
Construction Period |
: |
Jun 93 to Mar 94 |
1993-1994
Contract Title |
: |
Tai Po Tau `D` Pumping Station |
Contract No. |
: |
3/WSD/92 |
Client |
: |
Aoki Corporation |
End User |
: |
Water Supply Department |
Major item of work |
: |
Mild Steel pipeworks up to DN2200 |
Construction Period |
: |
Aug 93 to Nov 94 |
1993-1994
Contract Title |
: |
Tai Po Tau `D` Pumping Station |
Contract No. |
: |
3/WSD/92 |
Client |
: |
Mitsubishi Corporation |
End User |
: |
Water Supply Department |
Major item of work |
: |
Pump sets ( 5 nos.) to 3.218M3/sec
1500 kw each, Associated MS pipework, up to DN1800, Ventilation, Coarse Screens, Band Screens, GRP water tank and steel platform. |
Construction Period |
: |
Mar 93 to Apr 94 |
1993-1994
Contract Title |
: |
Tai Mei Tuk `A` Pumping Station |
Contract No. |
: |
19/WSD/92 |
Client |
: |
Mitsubishi Corporation |
End User |
: |
Water Supply Department |
Major item of work |
: |
Pumps sets (8 nos.) to 2.25m3/sec
600 kw each, Penstocks, Associated MS pipework up to DN1600, Ventilation and steel
platform. |
Construction Period |
: |
Mar 93 to Apr 94 |
1993-1994
Contract Title |
: |
Ap Lei Chau Sewage Pumping Station |
Contract No. |
: |
DE/92/03 |
Client |
: |
Simon-Hartley |
End User |
: |
Drainage Services Department |
Major Equipment |
: |
Sewage Pumps &
Associated pipework, Ventilation, Penstock and HVAC System. |
Construction Period |
: |
Nov 93 to Jan 94 |
1993-1995
Contract Title |
: |
Sheung Shui Water Treatment Plant |
Contract No. |
: |
8/WSD/91 |
Client |
: |
Water Engineering Ltd |
End User |
: |
Water Supply Department |
Major item of work |
: |
Inlet Pumping, Station Backwash Pumps, Sludge Pumps & Associated
Pipework, Air Blowers, Air Compressors, Thickening Tanks, Filter Tank,
Clarifier Tank, DAF System, Dewatering System, HVAC System, Chemical Dosing
System, Penstocks and GMS platform. |
Construction Period |
: |
Jun 93 to Feb 95 |
1993-1995
Contract Title |
: |
Sham Tseng Water Treatment Plant |
Contract No. |
: |
3/WSD/92 |
Client |
: |
Water Engineering Ltd |
End User |
: |
Water Supply Department |
Major item of work |
: |
Pump sets & Associated
pipework, Ventilation, Filter Tanks, DAF System, Chemical Dosing
System, Dewatering System, Penstocks, GRP Partition weir and GMS platform |
Construction Period |
: |
Aug 93 to Mar 95 |
Contract Title |
: |
Up-Grading Work Kwun Tong Sewage Pumping Station Plant Mechanical Installation |
Contract No. |
: |
DE/92/13 |
Client |
: |
Simon-Hartley |
End User |
: |
Drainage Services Department |
Major Equipment |
: |
Screw Pump Ø2800, Pipework, Fine Screens, Platforms, Dismantle the existing equipment. |
Construction Period |
: |
Jan 94 to Jun 94 |
1994-1996
Contract Title |
: |
4800 ¡V Macau STW ¡V Etar-Liquid Phase |
Contract No. |
: |
MAC/0048/90565 |
Client |
: |
Water Engineering Ltd (Macau) |
End User |
: |
Macau Drainage Services Department |
Major item of work |
: |
Ewage Treatment Plant Pumpsets & Pipeworks, Penstock, Aeration
System, PST System, Blowers & Pipeworks, HVAC System, Building Services. |
Construction Period |
: |
Dec 94 to Jan 96 |
1996-1998
Contract Title |
: |
Up-Grading of Existing Kwun Tong Preliminary Treatment Works |
Contract No. |
: |
DE/93/15 |
Client |
: |
Biwater Man Lee Ltd |
End User |
: |
Drainage Services Department |
Major Equipment |
: |
Coarse Screens, Fine Screens, Detritors, Grit classifiers, SS
Conveyor, Penstocks, Pumps and Pipeworks |
Construction Period |
: |
Jul 96 to Apr 98 |
1996-1998
Contract Title |
: |
Strategic Sewage Disposal Scheme - Stage I Principal Collection and Treatment System |
Contract No. |
: |
DE/93/18 |
Client |
: |
MitsTorishima (HK) Ltd |
End User |
: |
Drainage Services Department |
Major item of work |
: |
1. Mechanical Installation Works -
Stonecutters Island Main Pumping Station Pump sets (8 nos.) to 3.7M3/sec 2500 kw
each MS pipework up to DN2000 -
North West Kowloon Pumping Station -
Kwun Tong Pumping Station -
Tseung Kwan O Pumping Station 2. HVAC System, 3. GMS Maintenance Platform, 4. Deodorization Plants 5. Penstocks, FRP Water Tank |
Construction Period |
: |
Jul 96 to Apr 98 |
1997-1998
Contract Title |
: |
S/I of E&M Equipment for the Screen Channels at Shatin STW Replacement Works, Stage I |
Contract No. |
: |
DE/96/09 |
Client |
: |
Mitsubishi Corporation |
End User |
: |
Drainage Services Department |
Major item of work |
: |
Inlet Screen, Maintenance platforms, Handrailings, PLC panel, Cables
and electrical accessories. |
Construction Period |
: |
Sep 97 to May 98 |
1998-1999
Contract Title |
: |
Yuen Long / Kam Tin Flow Screw Pumping Station |
Contract No. |
: |
DE/95/17 |
Client |
: |
Wabag Water Engineering Ltd |
End User |
: |
Drainage Services Department |
Major item of work |
: |
Screw pumps Ø3500, Coarse Screen and Cleaning System with
steel platform, Penstocks and Stop logs |
Construction Period |
: |
Feb 98 to Jun 99 |
1998-1999
Contract
Title |
: |
Supply and Installation of Lime / Alum Chemical Metering Pumps for Shatin Water Treatment Works |
Contract No. |
: |
WSD/ST445/447/98 Pt.2 |
Client |
: |
Proto Engineering Co Ltd |
End User |
: |
Water Supplies Dept. |
Major item of work |
: |
Supply and Installation of Lime / Alum Chemical Metering Pumps,
Associated pipework, Modification of existing panel |
Construction Period |
: |
Jun 98 to Jan 99 |
1998-1999
Contract Title |
: |
Shatin Sewage Treatment Works Sludge Conditioning Facilities |
Contract No. |
: |
DE/97/03 |
Client |
: |
Chevalier (Envirotech) Ltd |
End User |
: |
Drainage Services Dept. |
Major item of work |
: |
Relocation of Existing Centrifuges, Installation of New Centrifuges,
Sludge Transfer System, Chemical Dosing System, FRP Water Tank, Conveying
System. |
Construction Period |
: |
Jun 98 to Aug 99 |
1998
Contract Title |
: |
Supply and Installation of Air Scour Valves and Associated Fittings at Silvermine Bay Treatment Works |
Contract No. |
: |
WSD/ST442/98 Pt.2 |
Client |
: |
Proto Engineering Co Ltd |
End User |
: |
Water Supplies Dept. |
Major item of work |
: |
Supply and Installation of Air Scour Valves and Associated Pipeworks. |
Construction Period |
: |
Jul 98 to Dec 98 |
1999
Contract Title |
: |
San Tin Floodwater Pumping Station |
Contract No. |
: |
DE/95/13 |
Client |
: |
Davenham Eng. Projects Ltd |
End User |
: |
Drainage Services Dept. |
Major item of work |
: |
Screw Pumps Ø2500 and Penstock |
Construction Period |
: |
May 99 to Dec 99 |
2000-2002
Contract Title |
: |
Tai Po Treatment Works and Pumping Station |
Contract No. |
: |
15/WSD/96 |
Client |
: |
Chevalier (Envirotech) Ltd |
End User |
: |
Water Supplies Dept. |
Major item of work |
: |
Main Pump to 3.218M3/sec
1500 kw each MS pipework up to DN1800, Surge Vessel Protection System 110 nos. Penstock (size
: fm 0.5M to 3.5M ) |
Construction Period |
: |
Mar 00 to Dec 02 |
2001
Contract Title |
: |
Pok Wai Floodwater Pumping Station |
Contract No. |
: |
DE/99/06 |
Client |
: |
Davenham Eng. Projects Ltd |
End User |
: |
Drainage Services Dept. |
Major item of work |
: |
Screw Pumps Ø1800 and Penstock. |
Construction Period |
: |
Jul 01 to Dec 01 |
2001-2002
Contract Title |
: |
Sandy Bay Pumping Station |
Contract No. |
: |
21/WSD/99 |
Client |
: |
Torishima (HK) Ltd |
End User |
: |
Water Supplies Dept. |
Major item of work |
: |
Replacement of High Head & Low Head Pumpsets and Associated pipework,
HVAC System, Steel platform with mesh flooring for (10 sets) motor |
Construction Period |
: |
Sep 01 to Jun 02 |
2001-2002
Contract Title |
: |
Yuen Long Area 16 Stormwater and Sewage Pumping Station |
Contract No. |
: |
DE/99/07 |
Client |
: |
Jebsen & Co Ltd |
End User |
: |
Drainage Services Dept. |
Major item of work |
: |
Screw Pumps Ø2500
and Penstock, Submersible Pumps, Inter Screen and Screenings Conveyor |
Construction Period |
: |
Sep 01 to Sep 02 |
2002
Contract Title |
: |
Shatin Water Treatment Works |
Contract No. |
: |
SO/WSD84/2001 |
Client |
: |
Proto Engineering Co., Ltd |
End User |
: |
Water Supplies Dept. |
Major item of work |
: |
Supply & Installation of Alum and Lime Metering Pumps |
Construction Period |
: |
Oct 02 to Dec 02 |
2002
Contract Title |
: |
Supply and Installation of pipeworks for pilot plant trials on combined UV disinfection. |
Contract No. |
: |
EM8/DEMP0218 |
Client |
: |
Drainage Services Dept. |
End User |
: |
Drainage Services Dept. |
Major item of work |
: |
Supply and Installation of pipeworks for pilot plant trials on combined UV disinfection. |
Construction Period |
: |
Sep 02 to Oct 02 |
2003
Contract Title |
: |
Shau Kei Wan
Preliminary Treatment Works |
Contract No. |
: |
DE2001/03 |
Client |
: |
Hydrotech Professional Ltd |
End User |
: |
Drainage Services Dept. |
Major item of work |
: |
Screw Pumps and Penstock |
Construction Period |
: |
Jan 03 to Dec 03 |
2003-2005
Contract Title |
: |
Shatin Sewage Treatment Works Stage III extension (Phase I works) |
Contract No. |
: |
DE/2000/01 |
Client |
: |
Biwater Man Lee Ltd |
End User |
: |
Drainage Services Dept. |
Major item of work |
: |
Installation of Electrical
& Mechanical Equipment, Dosing System, Aeration Tank No.1-12 & Inlet Works, FRP / Structure Steel
Platform. |
Construction Period |
: |
Jul 03 to Mar 05 |
2003-2004
Contract Title |
: |
S&I of E&M Equipment in Floodwater Pumping Station at Ma Tin Tusen and Shui Pin Wai |
Contract No. |
: |
DE/2001/04 |
Client |
: |
Chevalier (Envirotech) Ltd |
End User |
: |
Drainage Services Dept. |
Major item of work |
: |
Screw Pumps and Penstock |
Construction Period |
: |
Jul 03 to Feb 04 |
2004-2005
Contract Title |
: |
Village Flood
Protection Works for Sheung Cheung
Wai Pump House Extension |
Contract No. |
: |
YL55/02 |
Client |
: |
Biwater Man
Lee Limited |
End User |
: |
Drainage Services Dept. |
Major item of work |
: |
Screw Pumps and Penstock |
Construction Period |
: |
Jun 04 to Jan 05 |
2004-2005
Contract Title |
: |
Kwai Chung
Container Port Terminal 9 Development |
Contract No. |
: |
DE2001/03 |
Client |
: |
Torishima (HK) Ltd |
End User |
: |
Terminal 9 |
Major item of work |
: |
Sea Water Pumpsets & Pipeworks, Fire
Fighting Pumpsets & Pipeworks, GMS structure. |
Construction Period |
: |
Jul 04 to Apr 05 |
2004-2005
Contract Title |
: |
Water Supply to South East Kowloon Development ¡V Upgrating of Tai Wan
Salt Water P/S and Associated Mainlaying Work |
Contract No. |
: |
12/WSD/01 |
Client |
: |
Torishima (HK) Ltd |
End User |
: |
Water Supplies Dept. |
Major item of work |
: |
Sea Water Pumpsets & Pipeworks, GMS
structure |
Construction Period |
: |
Sep 04 to Sep 05 |
2005
Contract Title |
: |
Design, Supply and Installation
of Three Return Activated Sludge (RAS) Pump at RAS P/S No.3 |
Contract No. |
: |
DSD SH/5/35 |
Client |
: |
Torishima (HK) Ltd |
End User |
: |
Drainage Services Dept. |
Major item of work |
: |
Pumpsets & Pipeworks, GMS steel
structure for Pumpsets |
Construction Period |
: |
Jan 05 to |
2005
Contract Title |
: |
Replacement of Mechanical &
Electrical Equipment in Tai Po Tau Raw
Water P/S |
Contract No. |
: |
5/WSD/03 |
Client |
: |
Torishima (HK) Ltd |
End User |
: |
Water Supplies Dept. |
Major item of work |
: |
Pumpsets & Pipeworks, GMS Steel
Structure, Penstocks, Bandscreen House |
Construction Period |
: |
Jan 05 to |
2005
Contract Title |
: |
Mai Po
Floodwater Pumping Station Safety Plan |
Contract No. |
: |
DE/2002/13 |
Client |
: |
ABB (HONG
KONG) LTD |
End User |
: |
Drainage Services Dept. |
Major item of work |
: |
Screw Pumps and Penstock |
Construction Period |
: |
Feb 05 to Apr 05 |
2005
Contract Title |
: |
Fanling Raw
Water Pumping Station |
Contract No. |
: |
13/WSD/03 |
Client |
: |
Torishima (HK) Ltd |
End User |
: |
Water Supplies Dept. |
Major item of work |
: |
Pumpsets & Pipeworks, Valves |
Construction Period |
: |
Mar 05 to |
2005
Contract Title |
: |
San Tin Low
Flow Pumping Station |
Contract No. |
: |
DE/2002/05 |
Client |
: |
Biwater Man
Lee Limited |
End User |
: |
Drainage Services Dept. |
Major item of work |
: |
Screw Pumps and Penstock |
Construction Period |
: |
Apr 05 to |
2005
Contract Title |
: |
Low Flow Pumping Station at Yuen Long
Bypass Floodway |
Contract No. |
: |
DE/2003/01 |
Client |
: |
Chevalier (
Envirotech ) Ltd |
End User |
: |
Drainage Services Dept. |
Major item of work |
: |
Screw Pumps and Penstock |
Construction Period |
|